Skip to content

An MVP with an AI core. In production in 4 to 8 weeks.

A product screen assembling part by part, frame, cards and a chart, then running live.
Sprint
Product Sprint
Price
$25,000 to $50,000
Time
4 to 8 weeks
Fix window
60 days

Example builds.

What is included.

  • Included: Up to four user roles with authentication
  • Included: Payments or billing
  • Included: An admin console
  • Included: One or two AI workflows with evaluation sets and cost telemetry
  • Included: A design system and a responsive web app
  • Included: Staging and production environments on your cloud account
  • Included: Onboarding docs and a 60-day fix window

How the AI part works.

What the model does
The one thing your product is for. Understanding documents, matching people, generating drafts, answering questions over your data. We build that first and build the product around it.
What it must not do
Guess silently. Every AI output in the product shows its confidence or its source, and the product has a path for a person to correct it.
How we test it
An evaluation set from day one, run on every change. You see the accuracy curve move during the sprint, not after launch.
What it costs to run
Model and cloud usage run on your accounts. We instrument cost per request from the first week so pricing your product is based on numbers, not hope.

What this looks like

You have a product idea whose core is something a model can now do well: read, match, extract, summarise, generate. You need it in front of users with accounts, payments and an admin view, and you need it on a date.

A Product Sprint is that. One AI core, built and measured first. The product around it, built on a stack we have shipped before. Everything in your name.

How the sprint goes

Week one: scope in writing, accounts created under your organisation, the AI core on your data with a first accuracy number. First weekly demo. You can stop here and keep the work.

Weeks two to five: the product takes shape screen by screen, with a weekly demo and a visible “next” list for every idea we park.

Weeks six to eight: production deploy, payments live, monitoring, onboarding docs, a launch review where the “next” list becomes your first roadmap.

What you get at the end

A product in production on your own accounts, an accuracy number for its AI core, cost per request measured, and 60 days of fixes.

Questions we get on the first call.

Is 4 to 8 weeks enough for a real MVP?

For a focused product, yes. The sprint has one AI core, up to four roles, payments and admin. What it does not have is a second product idea. We cut scope on the first call, in writing, and the quote reflects it.

Do I need a designer?

A designer joins the sprint for one to two weeks for the product's key screens and a small design system. It is in the price.

What if my idea needs a model that does not exist yet?

Then we say so. Before quoting, we run a short feasibility test on your data. If the result is not good enough, you get the finding, not a sprint.

Can you take over after launch?

Yes. Most clients continue on a Continuous Build retainer with the same people, a weekly release and a roadmap call. It starts while the fix window is still open.

Book a call, or send the brief. A written price in three working days.

No NDA needed for the call. We sign one within 24 hours if you want it.